运费涨涨涨!8月1日起收取目的港拥堵费、交货费!9月1日起将收取塞港费!
8月1日起,以星开始收取目的港拥堵费、交货费。


赫伯罗特集装箱公司近日宣布,从印度次大陆、中东、巴基斯坦到北欧和地中海,提高20 '和40 '通用集装箱的海运费率,包括高立方集装箱。



所有新价格将从8月1日起适用于所有集装箱闸门,有效期至8月14日。
9月:MSC将征收塞港费!



BC wild fires continue to have rail main line operations severely constrained. CP Rail (CPR) and CN Rail (CNR) teams are on site and supporting local authorities.
Berth availability for vessels arriving at Vancouver Port terminals is delayed as a result.
As a result of the rail line closures, there is now a large backlog to work through and delays from 72 to 96 hours can be expected.
本文来源 | 浙江外贸

8月1日起,以星开始收取目的港拥堵费、交货费。


赫伯罗特集装箱公司近日宣布,从印度次大陆、中东、巴基斯坦到北欧和地中海,提高20 '和40 '通用集装箱的海运费率,包括高立方集装箱。



所有新价格将从8月1日起适用于所有集装箱闸门,有效期至8月14日。
9月:MSC将征收塞港费!



BC wild fires continue to have rail main line operations severely constrained. CP Rail (CPR) and CN Rail (CNR) teams are on site and supporting local authorities.
Berth availability for vessels arriving at Vancouver Port terminals is delayed as a result.
As a result of the rail line closures, there is now a large backlog to work through and delays from 72 to 96 hours can be expected.
本文来源 | 浙江外贸




福建
12-12 周五











